To this end, BESIX Group does not hesitate to go beyond limitations. Its Engineering and Design, Tendering, Methods and Planning departments are all involved in these projects and this gives that extra dose of imagination and innovation to carry them through successfully.
A Building Information Model (BIM) system is used to integrate all information relevant to a construction project into a 3D model.
The market is increasingly calling for more environmentally friendly buildings, with clients seeking to have their projects labelled HQE (Haute Qualité Environnementale), LEED (Leadership in Energy and Environmental Design) or BREEAM (Environmental Assessment Method).