The complex 14-storey structure, built on a highly constrained site during a global pandemic, presented a significant engineering challenge. Built by BESIX Watpac's experienced Queensland teams and supported by its in-house engineering services, the project required a high level of collaboration with local contractors, Blight Rayner Architecture, Floth and Robert Bird Group engineers.
The exceptional safety standards and collaboration on site were one of the many successes of this project. Throughout construction, the project maintained the BESIX Watpac safety record of zero lost time injuries. To achieve this, the team carried out over 600 safety inspections on site.