BESIX joined forces with OCI to build the complex, along with car parks (6,700 places), access roads, and the technical buildings needed for cooling and distributing electricity across this very special project. In the final stretch, more than 10,000 workers and subcontractors joined forces with the teams of the future retail outlets to ensure a top-quality welcome for the first visitors.
Highlights of the building work included casting the slabs of the huge floor, the huge slab roof that covers the mall, and the 'rocks' and columns of the indoor ski slope. With the help of specialist Egyptian companies, BESIX was able to recycle 75% of the waste of all trades on the construction site, an effort that contributed to the LEED Gold environmental certification awarded to the complex.