Émirats Arabes Unis, Abu Dhabi

Presidential Flight Guest Reception Terminal

Réception particulière pour hôtes d’état
Les hôtes de marque qui atterrissent à Abu Dhabi sont accueillis dans une zone privée où le marbre est roi. Un joyau construit par Six Construct en 11 mois seulement.

A very special welcome

State guests set foot on Abu Dhabi soil in a very special setting: their own terminal. It has 10,000m² of reception, gala, conference and press rooms on the ground floor, as well as two gardens, two presidential suites and two Majilis – spaces set aside for specific official ceremonies. A second floor measuring 10,000m² houses all the specific airport infrastructure these VVIPs need: a telescopic boarding bridge, baggage handling system and more.

Carpentry and monumental doors

A further 10,000m² is given over to parking, with landscaped areas measuring some 35,000m², an aircraft parking area, access ramp and heliport, electricity substation and security infrastructure. Six Construct employed 52,000m³ of reinforced concrete throughout the terminal, plus 23,000m² of marble, and other high-quality materials: 1,400m² of wall fabrics, 1,200m² of decorative panelling and six hand-crafted monumental doors.

L’inventivité et la détermination de nos équipes nous ont permis de relever ce challenge.

A gem in 11 months

These highly exceptional finishes were achieved in record time: Six Construct built and finished the terminal to a very high standard in just 11 months. The roof was prefabricated and installed in a single lift, and the marble brought in by air freight.

Détails du projet

Nom du projetPresidential Flight Guest Reception Terminal
LocalisationAbu Dhabi United Arab Emirates
Période de construction2010 - 2010
CatégorieAirports
Parties prenantesSix Construct
Type de contratBuild
ClientThe Supervision Committee for the Construction of the State Guest Reception Terminal (SRGT), under the Ministry of Presidential Affairs U.A.E.
Valeur totale euro€ 71547382