Verenigde Arabische Emiraten, Dubai

Dubai Cargo Terminal

Cargo Terminal van Dubai
De uitbreiding van de Cargo Terminal op de internationale luchthaven van Dubai is begin jaren 1990 in gebruik genomen. BESIX realiseerde de bouw ervan tijdens de Eerste Golfoorlog, met o.a. ook een drainage- en pompsysteem om het oppervlaktewater naar de baai van Dubai te stuwen.

Steel and concrete structures

Dubai International Airport has had additional cargo transportation infrastructure since the early 1990s. BESIX built the vast 27,000m² storage hangar and administrative building, both with a steel frame structure and precast concrete panels. A two-storey concrete structure measuring 10,000m² is dedicated to air freight agencies

Intelligent irrigation

BESIX built all the access roads, aircraft gates, fences, parking and loading/unloading areas. It also created the areas of planting surrounding the terminal. BESIX has installed an intelligent irrigation solution for these areas, based on a sophisticated surface water drainage and pumping station.

Ondanks de toenmalige penibele omstandigheden is het team erin geslaagd om een kwalitatief hoogstaand project in een recordtijd uit te voeren.

Projectdetails

ProjectnaamDubai Cargo Terminal
LocatieDubai, Verenigde Arabische Emiraten
Bouwperiode1990 - 1991
ActiviteitGebouwen
ErvaringsgebiedLuchthavens
Stakeholder(s)Six Construct
ArchitectInternational Bechtel Inc.
ContracttypeBuild
KlantGovernment of Dubai Department Civil Aviation, United Arab Emirates
Totale waarde euro€ 47.784.000

Relevante projecten

Benoit Vadani

Benoit Vadani

Acquisition and Development Manager