Verenigde Arabische Emiraten, Ruwais

Waterzuiveringsstation van Ruwais

Afvalwaterbehandeling midden in de woestijn
Op een afgelegen plek in het midden van de woestijn kwaliteitsvol water produceren uit afvalwater met een minimale impact op het milieu. Dat was de inzet van het buitengewone project dat BESIX in Abu Dhabi realiseerde.

The new water cycle

Since 2015, a wastewater treatment plant has been treating the wastewater of a population of 68,000 in the Ruwais region of western Abu Dhabi. Unusual is the plant's mid-desert location. Wastewater arrives in sewage trucks. Once treated, it is piped 10 km to feed the irrigation systems of the farms near Ruwais, and also the the surrounding forests, vital elements in combating desertification in nearby villages.

Oasis of a new kind

The BESIX-designed plant treats approximately 15,000 m³ of wastewater per day, with the potential to step up to 30,000 m³ daily. Its leading edge technologies, like the bubbling system that uses variable frequency drives to reduce aerosol dispersion, can compete with the best facilities in countries with more clement climates. The result is a minimized environmental impact, greater energy efficiency,  water of exceptional quality, well-controlled operating costs, and odourless facilities. To meet the stringent odour emission standards, the odours are eradicated through a 2-stage biological/ carbon absorption odour treatment plant, thereby eliminating the use of chemicals. All facilities are monitored by adequate instrumentation and a fullyequipped laboratory caters to the necessary water analysis. Once the raw sewage is treated, the clean water is stored on location before it is distributed to the Al Maydour forests where this high quality irrigation water is used to fight back the ever-encroaching desert sands.

Dit project noopte ons om buiten de gebaande wegen te treden en ons te installeren op een dorre, afgelegen plek op zo’n 2u30 rijden van Abu Dhabi.

Building in the desert

BESIX Environment managed all aspects of the project - from process design through to commissioning, including civil mechanical and electrical engineering. This assured timely completion of the project within budget and to the satisfaction of Abu Dhabi's Sewerage. This integrated multidisciplinary team proved to be a definite advantage in managing the challenges that came thick and fast. In particular in the logistics, with the plant being built in the middle of the desert, 2 1/2 hours by road from Abu Dhabi, on a site accessible only by 3 km of dirt road. The first task was therefore to erect housing for the site personnel and upgrade the access roads.

Projectdetails

ProjectnaamWaterzuiveringsstation van Ruwais
LocatieRuwais, Verenigde Arabische Emiraten
Bouwperiode2013 - 2015
ActiviteitMilieu
Stakeholder(s)Six Construct
ContracttypeDesign, Build & Maintenance
KlantAbu Dhabi Sewerage Services Company
Totale waarde euro€ 33.137.456